Services

Plant Inspection

EIWAA is fully equipped to carry outplant inspections in line with national and international standards. Inspections are done according to the following timelines:

  • Periodic external inspections
  • Overhaul or shutdown internal inspections
  • Emergency shutdown inspections Plant Inspection is including but not limited to the following scope.

Pressure Vessel, Heat Exchanger & Boiler Inspection

  • Inspection and Testing during the Manufacturing Phase
  • Inspection and Testing during the Operation Phase as per API 510

Storage Tank Inspection

  • Inspection and Testing during the Manufacturing Phase
  • Inspection and Testing during the Operation Phase as per API 653

Piping Inspection

  • Inspection and Testing during the Manufacturing Phase
  • Inspection and Testing during the Operation Phase as per API 570

Rotating Equipment Inspection

  • Inspection of Centrifugal Pumps in the manufacturing shops as per API610, BS7784 etc.
  • Inspection of Centrifugal Compressors in the manufacturing shops as per API617, BS2009 etc.
  • Inspection of Centrifugal Pumps in the manufacturing shops as per API610, BS7784 etc.

Industrial Valves

  • Inspection of Industrial valves as per API RP576, API574etc.

Shutdown/Turnaround Inspection

In order to revitalize, maintain, and improve the plants to ensure optimal and efficient performance periodic shutdown are planned in various industrial plants. The efficient and effective management of Schedule for Turnaround is vital. Mismanagement of turnaround activities is undesirable during such periods.

EIWAA is prepared to guide your plant efficiently and effectively through your next plant turnaround.

Our turnaround inspection services include:

  • Pre Shutdown/ Turnaround Evaluation
  • Pre Shutdown/Turnaround Inspections
  • Shutdown/Turnaround Inspections
    • API 570 Piping Inspections
    • API 510 Pressure Vessel Inspections
    • API 653 Above storage Tank Inspection.
  • Rotating Equipment Inspection
  • Failure Analysis
  • Post Shutdown/Turnaround Documentation